Warwick Township: Bonded Roadways
Warwick Township Municipal Building Welcome to Warwick Township (Lancaster County, PA)
Sign up for eAlerts!
Contact Us
Community Watch Alerts
View sub-linksAbout Us
View sub-linksAdministration
Hide sub-linksPolice Department
Police e-mail
2000-Current Accident Summary
Fire Police Use form
K 9 Unit
Bike Patrol
Community Watch
COMPSTAT
DARE
View sub-linksMunicipal Authority
View sub-linksPublic Works Department
View sub-linksParks & Recreation
View sub-linksRecycling
L.R.W.A.
View sub-linksW.E.S.A.
Lancaster County Gov't Homepage
Calendar of Events
View as Text-Only
Home
Log into the Warwick Township Website Register for an Account


Warwick Township Home  Back  Printable Version  Text-Only  Full-Screen  eMail  Previous  Next

WARWICK TOWNSHIP
PUBLIC WORKS DEPARTMENT

(updated 4/28/2011)

Notice of bonded roadways is required under Chapter 277, Section 40 of the Warwick Township Code of Ordinances. This section states that open cutting of a bonded roadway surface will be prohibited for a five-year period following completion of roadway improvements. Therefore, any new utility installation that may be required must be completed prior to the roadway improvements. The only exception would be in case of an emergency involving the affected roadway.

List of bonded roadways and effective dates (5 yr. Period)  

STREET NAME EFFECTIVE DATE EXPIRATION DATE
Brookwood Drive (entire length) July 30, 2009 July 30, 2014
Clay Road (SR 772 to end of Municipal Campus) September 16, 2008 September 16, 2013
Clay Road (E. Newport Rd. to Pine Hill Rd.) September 15, 2008 September 15, 2013
Countryside Lane (entire length) July 30, 2009 July 30, 2014
Dale Drive (entire length) August 6, 2008 August 6, 2013
Deer Run Road (entire length August 6, 2008 August 6, 2013
E. Newport Road (Millway Rd. to Rothsville Station Rd.) August 24, 2006 August 24, 2011
E. Woods Drive (SR501 to Landis Valley Rd.) July 28, 2009 July 28, 2014
Elbow Road (entire length) August 24, 2006 August 24, 2011
Fawnwood Circle (entire length) August 6, 20008 August 6, 2013
Jeffrey Lane (entire length) August 6, 2008 August 6, 2013
Julie Terrace (entire length) May 21, 2010 May 21, 2015
Karen Court (Julie Terrace to Phase line) May 21, 2010 May 21, 2015
Kings Cross Circle (entire length) June 27, 2007 June 27, 2012
Kings Cross Road (entire length) June 27, 2007 June 27, 2012
Knightsbridge Way (Regents Dr. to Phase II) June 27, 2007 June 27, 2012
Knollwood Drive (entire length) August 6, 2008 August 6, 2013
Lissann Lane (entire length) May 21, 2010 May 21, 2015
Meadow Valley Road (Rothsville Rd. to Briar Hill Rd.) August 5, 2008 August 5, 2013
Perch Place (entire length) July 30, 2009 July 30, 2014
Picnic Woods Circle (entire length) July 3, 2006 July 3, 2011
Picnic Woods Road (entire length) July 3, 2006 July 3, 2011
Queens Gate Road (entire length) June 27, 2007 June 27, 2012
Water Edge Road (Woodcrest Ave. to Twp. line) May 20, 2010 May 20, 2015
Woodview Drive (entire length) August 6, 2008 August 6, 2013
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

CHAPTER 277
ARTICLE IV
STREETS AND SIDEWALKS

§277-40. RECONSTRUCTION OR RESURFACING.

1. When the Township shall propose to reconstruct or resurface any street, the Road Superintendent or his or her designated representative shall serve written notice by certified mail of such improvement to all persons owning property abutting the road about to be improved and to all public utility companies and municipal authorities operating in the Township. Within 90 calendar days from receipt of such notice, all notified persons shall complete or cause to be completed all necessary repairs and replacement of utility mains, service under the street and designated curb and sidewalk areas.

2. Notified persons shall also complete any new installations under the street and designated curb and sidewalk areas required for use within a 5 year period thereafter. All repairs, replacements and new installations shall be in first-call condition so that the same cannot reasonably be expected to require repairs or renewal within a period of at least 5 years thereafter.

3. Upon failure of any notified person or persons to comply with the notice from the Road Superintendent or his or her designated representative to place the same in first-class condition as hereinbefore provided, the Township shall cause existing utility mains, service connections and/or laterals to be placed in first-class condition as aforesaid or to be entirely removed if not used or necessary for public convenience, whereupon the Township shall be entitled to collect the cost of such renewals, repairs, removal or other work from the aforesaid responsible person or persons, either by invoicing the person or persons or, in case of water or sewer house connections, by filing municipal liens therefore against the abutting properties benefited by such connections.

4. This Section shall not forbid, however, the installation by tunneling, after successful petition to the Township Supervisors, of new pipes, conduits or other services or structures or the repair, replacement or removal of those already existing in or under the portions of such streets improved as aforesaid, in accordance with applicable rules and regulations, upon obtaining a permit and payment to the Township of the same fees as prescribed by the provisions of this Part for making a surface opening in the street.

(Ord. 178, 11/19/1997)





Content Last Modified on 4/28/2011 8:59:49 AM



Warwick Township Home  Back  Printable Version  Text-Only  Full-Screen  eMail  Previous  Next



315 Clay Road
P.O. Box 308
Lititz, PA 17543-0308
(717) 626-8900
(717) 626-8901 fax

Send technical questions to webmaster@co.lancaster.pa.us

Send content questions to Warwick Twp.

Copyright © 2001 County of Lancaster, Pennsylvania. All Rights Reserved.
Disclaimer